--- url: https://docs.codefox.ai/apps/fennec/manage-opportunities.md --- # Move opportunities through the pipeline This page shows you how to work opportunities on the board, quote them, send their agreements for signature through Corsac, and close them as won or lost. ## Before you start * You can use Fennec. * Most opportunities start from a converted lead; see [Work your leads](/apps/fennec/work-your-leads). * Agreements need Fennec and Corsac linked on the server, and a person who can manage Fennec to choose the templates. See [Set up Fennec for your team](/apps/fennec/set-up-for-your-team#send-agreements-through-corsac). ## Read the board 1. Select **Opportunities** in the menu. 2. Pick a view: **Board**, **Table**, **Cards** or **Calendar**. 3. Use **Group by** to group by **Stage**, **Owner**, **Brand** or **Channel**, and the filters to narrow by owner or channel. Each card shows how long the opportunity has sat in its stage. An opportunity past its stage's **Days before stuck** is marked stuck. The pipeline's figures, its value and weighted value among them, sit beside the board. ## Open an opportunity by hand Most opportunities come from converting a lead. To open one directly: 1. Select **+ New opportunity**. 2. Fill in the **Opportunity title** and pick a **Contact**. An opportunity needs one. 3. Pick the **Pipeline** and **Stage**, and add **Value (optional)**, **Currency**, **Owner** and **Expected close**. 4. Select **Create opportunity**. ## Move an opportunity to another stage * On the board, drag the card to the next stage's column. * On the opportunity's page, select a stage on its stage bar and confirm with **Move**. Skipping a stage asks you to confirm the skip. Moving back asks **Was the earlier move a mistake?**: answer **Yes, it was a mistake** if it never really got past that stage, or **No, it really happened** if it did and has slipped back. Your team's rules can propose a move, for example to **Won** when the closing agreement comes back signed. The proposal shows as a banner on the opportunity: confirm it, or select **Dismiss**. ## Keep the opportunity up to date On the opportunity's page: * **Log activity** records a note, a meeting or a call, with a follow-up task if there is one. * **Edit the opportunity** changes "What it is, what it is worth, when it closes and who owns it." * Under **Also on this opportunity**, select **Add** to put another lead or contact on it. * When the expected close date has passed, Fennec says so: select **Change the date**, or close the opportunity. ## Build a quote 1. On the opportunity's **Quotes** card, select **New quote**. 2. Add lines from a price list, add a bundle, or type a description and a price. The price list fixes the quote's currency. 3. Open the quote. 4. Select **Print / save as PDF**. Where the server runs the PDF renderer, **Download PDF** is there too. To keep a proposal or quote made outside Fennec, select **Attach** and upload the file. It counts in the Proposals Sent report once you mark it **Sent**, **Accepted** or **Rejected**. ## Send an agreement for signature Your team's pipeline drafts agreements in Corsac at set stages, once a Corsac template is chosen for each kind. On a new install the kinds are an **NDA**, drafted when an opportunity reaches **Qualified**, and an **SOW** (statement of work), drafted when it reaches **Proposal**. A draft is not sent until you send it. 1. Open the opportunity. When a draft is ready, Fennec says "The {kind} draft is ready to send". 2. On the **Agreements** card, read the drafted line (the purpose of an NDA, the scope of a statement of work). 3. To change the line, select **Edit** and write one sentence. 4. If you changed it, select **Redraw with this line**. Fennec draws a new draft in Corsac and deletes the old one. 5. Select **Send**. 6. Confirm. "Corsac emails every signer their invitation, and it can no longer be edited." To chase a signer, select **Copy signing link** and send the link to them yourself. The card shows each agreement's status: a draft not yet sent, **Out for signature**, **Signed**, **Declined**, **Voided**, **Expired**, **Deleted in Corsac** or **Could not be prepared**. If no draft was made, select **Prepare the** and the agreement's name to draw one. To see the document itself, select **Open in Corsac**. When the closing agreement comes back signed, Fennec stamps the opportunity and your team's rules propose moving it to **Won**. Signing does not close the opportunity by itself: a person confirms the win. What the signer sees is on [Sign a document](/apps/corsac/sign-a-document). ## Close an opportunity as won or lost * **Won**: move it to **Won**, or confirm the win banner, which asks when the work starts. A won opportunity raises a kickoff task for the delivery owner. * **Lost**: move it to **Lost**. Fennec asks "Close {name} as lost?". Add a **Lost reason (optional)** and select **Mark as lost**. It leaves the open pipeline. A lost opportunity goes to the **Win-Back Hub** in the menu. On the opportunity, fill in the **Win-Back details**: why it was lost, the objections, the competitor and what would need to change, plus a **Suggested win-back date**. As the date nears, the opportunity's page tells you to call them back. To reopen a lost opportunity, select **Reopen at** and the stage on its stage bar. ## Troubleshooting ### Fennec will not create the opportunity A new opportunity needs a contact. Pick one, or start from the person's lead and convert it. ### The agreement says Could not be prepared Fennec asked Corsac for the draft and it failed, for example because nobody is set to sign for your brand or the template's roles are not mapped. The card says why. Ask a person who can manage Fennec to check **Settings** › **Options** › **Agreements drawn at the stage**, then select **Prepare again**. ### No agreement is drafted at the stage A kind of agreement with no Corsac template chosen is never drawn. Ask a person who can manage Fennec to pick one under **Agreements drawn at the stage**. ### A stage move asks you to fill in a field Your team has made a field required at that stage. Fill it in on the opportunity, then move it again. ### The agreement says Deleted in Corsac Someone deleted the document in Corsac. Fennec warns before drawing another: "Corsac no longer has this {kind}. If it was already sent or signed there, do not draw another." Check in Corsac first. ### Copy signing link does nothing The browser refused to copy. Open the agreement in Corsac with **Open in Corsac** and copy the link there. ### Download PDF is missing on a quote The server does not run the PDF renderer. Use **Print / save as PDF** and choose to save as PDF in the print dialog.